Batteries for business
One cabinet, 211 or 261 kWh. Connected and ready.
Battery, inverter, cooling and fire suppression in one outdoor cabinet. We work out which size fits your consumption, arrange installation and grid connection, and stay with the project until it runs.
Request a proposal
The problem
Your power costs most exactly when you need it.
Peaks
Every peak above your contracted capacity costs extra, even if it only lasts fifteen minutes.
Solar power that leaks away
What your panels produce too much during the day earns little, and in the evening you buy at a high price.
Downtime
When the grid fails, cooling, pumps and production stop. That damage is often larger than the electricity bill.

The solution
Two sizes, the same design
BESS 211
211 kWh · 100 kW
For offices, greenhouses, cold stores and mid-sized businesses.
- Switches automatically between grid and island mode
- Up to 20 cabinets in parallel on the grid, 4 off-grid
- Suitable for solar and diesel microgrids
BESS 261
261 kWh · 125 kW
For larger consumers, EV charging hubs and rooftop solar with a large surplus.
- Can start without the grid (black start)
- Expand with cabinets side by side
- Operates from −30 to +50 °C
The specifications side by side
- Capacity
- BESS 211211 kWh
- BESS 261261 kWh
- Power
- BESS 211100 kW
- BESS 261125 kW
- Cells
- BESS 211LFP, 300 Ah
- BESS 261LFP, 314 Ah
- Cell cycle life
- BESS 211more than 8,000 cycles
- BESS 261not stated
- System voltage
- BESS 211704 V (600 to 803 V)
- BESS 261832 V (728 to 936 V)
- AC side
- BESS 211400 V, 50/60 Hz
- BESS 261400 V ±15%, 50/60 Hz
- Cooling
- BESS 211liquid cooling, air-cooled inverter
- BESS 261liquid cooling
- Fire safety
- BESS 211temperature, smoke and gas detection, aerosol suppression, explosion relief panel
- BESS 261aerosol suppression, explosion venting
- Enclosure
- BESS 211IP55
- BESS 261IP55, corrosion class C4M
- Operating temperature
- BESS 211−20 to 45 °C (derating above)
- BESS 261−30 to 50 °C
- Dimensions (W × D × H)
- BESS 2111,340 × 1,300 × 2,260 mm
- BESS 2611,120 × 1,350 × 2,450 mm
- Weight
- BESS 211approx. 2.6 t
- BESS 2612.6 t
- Efficiency
- BESS 211not stated
- BESS 261up to 91%
- Communication
- BESS 2114G, RS-485, Ethernet · Modbus RTU, MQTT
- BESS 261RS-485, 2 × Ethernet · Modbus, MQTT
- Standards
- BESS 211IEC 62619, IEC 62477-1, IEC 63056, UL 9540A (pack), UN 38.3
- BESS 261IEC 62619, IEC 62477, IEC 63056, UL 9540A, UN 3480
Source: manufacturer datasheets, version 3.0 (2025), and the product page for the efficiency of the 261. Checked on 17-10-2026.
Grid code: certified to EN 50549, among others for the Netherlands, Belgium and Germany. For Spain we check the connection requirements per project.
These cabinets are already running
From one cabinet at a farm to fourteen at a solar park.

211 kWh · 100 kW
Belgium · 1 cabinets BESS 211

422 kWh · 200 kW
Netherlands · 2 cabinets BESS 211

2,11 MWh · 1 MW
Netherlands · 10 cabinets BESS 211

2,11 MWh · 1 MW
Lithuania · 10 cabinets BESS 211

3,13 MWh · 1,5 MW
Germany · 12 cabinets BESS 261

3,65 MWh · 1,75 MW
Ukraine · 14 cabinets BESS 261
Installations by the manufacturer for other customers in Europe, commissioned in 2026. Not Adapto Power projects.
What they are for
- Peak shaving
- The battery supplies the peaks, so you stay within your contracted capacity.
- Using your own solar power
- Store the midday surplus for the evening or the weekend.
- Backup power
- When the grid fails, the most important circuits keep running.
- Charging and microgrids
- Power EV chargers without a grid upgrade, or a site without a grid connection.

How we work
- 1
Advise
With your quarter-hourly data or bills we work out which size and how many cabinets you need, and what it saves.
- 2
Engineer
Placement, cabling, connection to your installation and coordination with the grid operator.
- 3
Deliver
Transport, installation by a licensed installer, commissioning and remote monitoring.
We send the datasheet and installation manual on request, together with the proposal.
Request a proposal
We'll get in touch to go through your situation. There's no obligation.